Detailed explanation of the usage steps and installation requirements of the cast iron platform


Cast iron flat plates are used for machine tools, machinery, inspection and measurement, to check the dimensions, accuracy, flatness, parallelism, flatness, verticality, and positional deviation of parts, and to draw lines.

 

A high-precision cast iron platform should be placed at a constant temperature of 20 ℃± 5 ℃. During use, excessive local wear, scratches, and scratches should be avoided, which may affect the flatness accuracy and service life. The service life of cast iron flat plates should be long-lasting under normal conditions. After use, it should be cleaned thoroughly and rust prevention measures should be taken to maintain its service life. The tablet needs to be installed and debugged during use. Then, wipe the working surface of the flat plate clean and use it after confirming that there are no problems with the cast iron flat plate. During use, be careful to avoid excessive collision between the workpiece and the working surface of the flat plate to prevent damage to the working surface of the flat plate; The weight of the workpiece cannot exceed the rated load of the flat plate, otherwise it will cause a decrease in work quality, and may also damage the structure of the test flat plate, and even cause deformation of the flat plate, making it unusable.

 

Installation steps for cast iron flat plates:

  1. 1. Package on the platform, check if the accessories are intact, and follow the instructions to find the accessories.
  2. 2. Use lifting equipment to lift the 3D welding platform, align the support legs of the 3D welding platform with the connecting screw holes, position them with countersunk screws, tighten them with a wrench in sequence without falling off, and check the correctness of the installation screws.
  3. 3. After the installation of the cast iron flat support legs, horizontal adjustment should be carried out and the installation level should be checked using a frame level. First, the main support point of the welding platform should be found, and the main support point should be leveled. After reaching the horizontal requirements, all supports should be fixed and the installation is completed.